{"id":1268,"date":"2012-12-08T08:14:35","date_gmt":"2012-12-08T12:14:35","guid":{"rendered":"http:\/\/www.chuckpaine.com\/blog\/?p=1268"},"modified":"2012-12-08T08:14:35","modified_gmt":"2012-12-08T12:14:35","slug":"1268","status":"publish","type":"post","link":"https:\/\/www.chuckpaine.com\/blog\/?p=1268","title":{"rendered":""},"content":{"rendered":"<div id=\"attachment_1269\" style=\"width: 610px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.chuckpaine.com\/blog\/?attachment_id=1269\" rel=\"attachment wp-att-1269\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1269\" class=\"size-full wp-image-1269\" title=\"painted sternview blog\" src=\"http:\/\/www.chuckpaine.com\/blog\/wp-content\/uploads\/2012\/12\/painted-sternview-blog1.jpg\" alt=\"\" width=\"600\" height=\"353\" srcset=\"https:\/\/www.chuckpaine.com\/blog\/wp-content\/uploads\/2012\/12\/painted-sternview-blog1.jpg 600w, https:\/\/www.chuckpaine.com\/blog\/wp-content\/uploads\/2012\/12\/painted-sternview-blog1-450x264.jpg 450w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><p id=\"caption-attachment-1269\" class=\"wp-caption-text\">THE PAINE 14 PAINTED AND READY TO FLIP<\/p><\/div>\n<p>Finally, the months of laminating, fairing, puttying, sanding, highbuild priming, sanding, finish priming, sanding, sanding and more sanding, are over! In two short days last week I sprayed the linear polyurethane finish coats and Amelia is ready for the &#8220;turnover party.&#8221; This will enable more months of constructing the decks, floorboards, seat supports and coamings. Then finally a few more weeks of varnishing, sanding, varnishing, sanding, sanding, sanding&#8230;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Finally, the months of laminating, fairing, puttying, sanding, highbuild priming, sanding, finish priming, sanding, sanding and more sanding, are over! In two short days last week I sprayed the linear polyurethane finish coats and Amelia is ready for the &#8220;turnover party.&#8221; This will enable more months of constructing the decks, floorboards, seat supports and coamings. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1268","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.chuckpaine.com\/blog\/index.php?rest_route=\/wp\/v2\/posts\/1268","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.chuckpaine.com\/blog\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.chuckpaine.com\/blog\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.chuckpaine.com\/blog\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.chuckpaine.com\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1268"}],"version-history":[{"count":1,"href":"https:\/\/www.chuckpaine.com\/blog\/index.php?rest_route=\/wp\/v2\/posts\/1268\/revisions"}],"predecessor-version":[{"id":1270,"href":"https:\/\/www.chuckpaine.com\/blog\/index.php?rest_route=\/wp\/v2\/posts\/1268\/revisions\/1270"}],"wp:attachment":[{"href":"https:\/\/www.chuckpaine.com\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1268"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.chuckpaine.com\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1268"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.chuckpaine.com\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}